Technology introduction of EPM
Step 1: Configuration "Easy"
Step 2: Configuration "Basic"
Step 3: Configuration "Professional"
Step 4: Configuration "Full"

Plan costs (budget) project

Plan costs (budget) of the project - the list of project costs distributed over the work of the project. Preliminary budget for the project is formed on the results of projects analogues, after determining the number and value of resources used, as well as after the conclusion of contracts, the plan specifies the cost of the project. The electronic form of this document is part of the schedule.

Plan project costs

Plan costs (budget) project

Plan costs (budget) project

Plan costs (budget) project

Processes which use this document:

This document is developed within the framework of coaching«Assigning costs and contractors on the project tasks»


Образование в Украине образовательный портал Preply.com Обучение и трудоустройство проектных менеджеров