Drawing up a design schedule is another matter, but drawing up a design schedule that will be minimally corrected during the implementation process ... It is quite possible! The main thing is to know the “places” that require special attention of the manager.

Management reinforcement of architectural graphics

Any project, the products of which is intellectual development, and not a specific material product, is always difficult because of the tasks that are conditionally unlimited in time. It is difficult to cut the best solution by deadlines, but if you know which processes are uselessly taking up time for the project, you can save that time by organizing the work correctly.

One of the key processes is the task exchange process. And it includes all the participants in the design at once. Therefore, it is important that the manager, together with the Chief Engineer, General Manager, Chief Designer, should work in this segment in the most efficient way. Determine a clear sequence of work, while taking into account the peculiarities of obtaining information by each specialist. Already at the stage of exchange of tasks, all key design solutions must be worked out by each direction, and it does not matter who and when the more intensive process of developing design documentation begins.

Create a Gantt chart in which participants can visually feel the importance of their work and influence other professionals. The graph is exactly the tool that allows you to visualize the process with the combination of tasks into one logical chain to achieve the set goal, which was previously stored “in the head” of each specialist, but, unfortunately, was not in any way consolidated with the heads of other design participants.

In addition to high-quality planning, which is the key to optimal work performance, the manager must carefully monitor the implementation of the task exchange block during the project implementation and provide all the necessary information to meet the deadlines.

We, consultants, often encounter the described difficulties when implementing corporate project management systems. Working with the schedule of architectural projects is the most painstaking and for its successful implementation, trained specialists are needed. So we recommend taking courses on project management in MS Project Pro. When implementing a corporate management system in your company, we will reduce your valuable time.

Фото автора статьи Victoria Los

Author:

Victoria Los

Professional project manager, consultant for the implementation of the corporate project management system MS Project Online

Настройка Microsoft Project Server 2010 для компании «XXI Век»
Внедрение КСУП на базе MS Project Server 2013 для ООО
Внедрение КСУП на Богучанской ГЭС для компании
Внедрение КСУП на базе MS Project Server в
Проект модернизации налоговой службы Украины
Внедрение КСУП на базе MS Project 2013 ТОВ
Внедрение КСУП на базе Microsoft Project Server 2013 в компании BI Group
Внедрение КСУП в ПАТ «Домостроительный комбинат №4»
Внедрение КСУП на базе MS Project Online в компании «Архиматика»
Внедрение КСУП на базе MS Project Online для ООО
Развитие системы управления проектам для общественной организации «Объединение ответственных граждан»
Проект внедрение КСУП в девелоперской компании «Інтергал‑Буд» на базе Microsoft Project Online.
Внедрение инструментов проектного управления в компании «DEZEGA Holding Ukraine»
Внедрение инструментов проектного управления в компании «СТРУКТУМ»
Внедрение проектного управления в компании «Хорос» на базе MS Project Pro и MS Project Online
Внедрение инструментов проектного управления в компании «Новос Девелопмент»